Customization: | Available |
---|---|
Type: | Semi-Trailer |
Load Capacity: | 20t |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Payloading Weight |
ton | 5ton, 6ton 10ton,12ton,15ton,25ton, 30ton,40ton,50ton,60ton, |
metric ton |
5metic ton,5metric ton,10metric ton, 20metric ton, 30metric ton, 40metric ton,50metric ton,60metric ton, 70metric ton,80metric ton |
|
kg | 5000kg 6000kg 12000kg | |
Description | Title | lpg tank, lpg storage tank, lpg transport tank, lpg tanker trailers, propane transport trailers for sale, propane tanker trailers for sale, 20m3 lpg skid filling station, lpg filling skid station, gas filling station, lpg skid-mounted filling station,lpg cylinder filling plant, lpg cylinde filling station |
Volume | cbm | 5cbm 10cbm 15cbm 12cbm 20cbm 25cbm 30cbm 40cbm 50cbm,60cbm 70cbm 80cbm 100cbm 120cbm |
m3 | 5m3 10m3 12m3 15m3 20m3 25m3 30m3 40m3 50m3 60m3 70m3 80m3 100m3 120m3 |
|
liters | 5000liter 10000liter 12000liter 15000liter 20000liter 25000liter 30000liter 40000liter 50000liter 60000liter 70000liter 80000liter 90000liter |
SPECIFICATIONS | ||||
Standard in China | ||||
1 | pressure vessels | |||
2 | GB/T19905-2005 Liquefied gas truck | |||
3 | Movable Pressure vessel safety technology and inspection procedures | |||
4 | ||||
Tanker Essential Information | ||||
1 | Dimensions(length*width*height) | 12982*2500*3990(mm) | ||
2 | Estimated Tare Weight | 16396KG | ||
3 | Payload | 23604KG | ||
4 | Total Weight | 40000KG | ||
Shell Of Tanker | ||||
1 | Products | LPG , Propane | ||
2 | Fluid property | Flammable | ||
3 | Design temperature | to 50ºC | ||
4 | Design pressure | 1.61MPa | ||
5 | Corrosion allowance | 1.0mm | ||
6 | weld joint factor | 1.0 | ||
7 | Major materials of bearing pressure | Tanker body : Q345R , 12mm GB713 | ||
End plate : Q345R , 14mm GB713 | ||||
Main Beam : AG700(Non-bearing pressure material) |
||||
16MnIIINB/T47008 | ||||
8 | Filling weight per volume | |||
9 | Maximum filling weight | |||
10 | Compartments | ONE | ||
11 | Shape | Round(elliptica) | ||
Detection | ||||
1 | Heat treatment | Overall heat treatment in a furnace , 600ºC to 640ºC | ||
2 | Flaw detection | 100% Flaw detection | ||
3 | Test PRESSURE | 1.61MPa | ||
4 | hydraulic test | 2.1MPa | ||
5 | Magnaflux | Aim at welding place flaw detection can not cover | ||
Manhole (As customer's requirement ) (DN450) | ||||
1 | Quantity | 1 ; On top | ||
Safety Valve (As customer's requirement ) | ||||
1 | Quantity | One | ||
2 | Location | On the top of tanker ; | ||
3 | Size | A412F-25-22 DN100 or as custom requirement | ||
LEVEL G UAG E(As customer's requirement ) ZGM 2.47/2.5 | ||||
1 | Quantity and Model | |||
2 | Location | On bottom of tanker | ||
3 | Size | As customer's requirement | ||
Valve and pipe Detail (As customer's requirement ) | ||||
Running System | ||||
1 | Axles | 3 | 13 TON FUWA Axles 1 | |
2 | Suspension system | 1 | FUWA leaf spring suspension 13*90*10 | |
3 | Wheel rim | 12 | 9.0*22.5 | |
4 | Tyre | 12 | Brand : Triangle,12R22.5 | |
5 | Kingpin | 1 | 3.5",bolt on ,in rubbing plate,fabricated | |
6 | Landing legs | 2 | JOST D200 single linkage, Gear type ,28T | |
Control System | ||||
1 | Emergency Cut-off Valves | 4 | Gas phase QGJ43F-25-8 liquid phase QGJ43F-25-7 |
|
2 | Ball Valve | 4 | Gas phase Q41F-25P-9 liquid phase Q41F-25P-8 |
|
3 | operating mode | 2 | Mechanical | |
4 | Liquid gauge | 1 | ZGM 2.47/2.5 | |
5 | Pressure indicating thermometers | 2 | WTQ-280 -40-80ºC level 1.5 | |
6 | · pressure gage | 2 | YTN-100T 0-4MPa level 1.6 | |
Pneumatic Brake System | ||||
1 | Spring brake chamber | 6 | FUWA | |
2 | Air connector | 2 | FUWA | |
3 | Relay Valve | 1 | A412F-25-22 DN100 1.72MPa | |
4 | ABS | 1 | ABS | |
Electronical System | ||||
1 | 7-Pin Socket | 1 | 24V 7-pin socket | |
2 | LED Lamp | 1 | All kinds of lamp | |
3 | Cable | 1 | Stander cable | |
Accessories | ||||
1 | Small Tool box | 1 | ||
2 | Wheel carrier | 2 | ||
3 | Fire extinguisher | 2 | 8kg With red box | |
4 | Cabinet | 2 | ||
5 | Steel fender | 6 | ||
6 | Static conductive belt | 1 | C shape | |
7 | Impeller blasting | 1 | Completely | |
8 | Paint | 1 | As customer requirements | |
TERMS | ||||
1 | Payment terms: 30%TT in advance,the balance should be paid before shipment.Or L/C at sight.(BY T/T or L/C) | |||
2 | Terms of delivery: in 40 days after the seller received 30% advance payment (try deliver the goods as soon as possible) |
|||
3 | PORT:Tianjin or Qingdao or Shanghai | |||
4 | MOQ: one unit | |||